Abstract
We study the problem of scheduling maintenance on arcs of a capacitated network so as to maximize the total flow from a source node to a sink node over a set of time periods. Maintenance on an arc shuts down the arc for the duration of the period in which its maintenance is scheduled, making its capacity zero for that period. A set of arcs is designated to have maintenance during the planning period, which will require each to be shut down for exactly one time period. In general this problem is known to be NP-hard, and several special instance classes have been studied. Here we propose an additional constraint which limits the number of maintenance jobs per time period, and we study the impact of this on the complexity.
| Original language | English |
|---|---|
| Pages (from-to) | 885-905 |
| Journal | Journal of Combinatorial Optimization |
| Volume | 32 |
| Issue number | 3 |
| Early online date | 29 May 2015 |
| DOIs | |
| Publication status | Published - Oct 2016 |
Fingerprint
Dive into the research topics of 'Scheduling arc shut downs in a network to maximize flow over time with a bounded number of jobs per time period'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver