Abstract
A bi-objective single machine scheduling problem with energy consumption constraints is studied, in which the objective functions are the total weighted completion time and the total weighted tardiness. Given the NP-hard nature of the problem, a multi-objective particle swarm optimization (MOPSO) algorithm is adopted to solve the problem. Since the original version of the MOPSO was designed for continuous optimization problems, it is crucial to decode its results in order to obtain feasible schedules. After the algorithm framework is determined, key parameters of the MOPSO are analyzed. A design of experiments (DOE) approach based on the Taguchi method is used to optimize parameters of the MOPSO algorithm for both small-scale and large-scale problem instances. To assess the algorithm's performance, we compare it to a well-known multi-objective evolutionary algorithm, the NSGA-II. DOE analysis is also carried out for tuning the parameters of the NSGA-II. Comprehensive computational experiments with different performance measures confirm that the modified MOPSO performs well on both small-scale and large-scale instances tested, and its performance is often superior compared to the NSGA-II.
| Original language | English |
|---|---|
| Title of host publication | 2017 IEEE Symposium Series on Computational Intelligence, SSCI 2017 - Proceedings |
| Place of Publication | United States of America |
| Publisher | IEEE |
| Pages | 1-8 |
| ISBN (Print) | 9781538627266, 9781538627273 |
| DOIs | |
| Publication status | Published - 31 Dec 2017 |
| Event | 2017 IEEE SSCI: Symposium Series on Computational Intelligence - Honolulu, HI, USA Duration: 27 Nov 2017 → 1 Dec 2017 |
Conference
| Conference | 2017 IEEE SSCI: Symposium Series on Computational Intelligence |
|---|---|
| City | Honolulu, HI, USA |
| Period | 27/11/17 → 1/12/17 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 7 Affordable and Clean Energy
Fingerprint
Dive into the research topics of 'Multi-objective optimization of single machine scheduling with energy consumption constraints'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver