Abstract
We consider the scheduling of the annual maintenance for the Hunter Valley Coal Chain. The coal chain is a system comprising load points, railway track and different types of terminal equipment, interacting in a complex way. A variety of maintenance tasks have to be performed on all parts of the infrastructure on a regular basis in order to assure the operation of the system as a whole. The main objective in the planning of these maintenance jobs is to maximize the total annual throughput. Based on a network flow model of the system, we propose a mixed integer programming formulation for this planning task. In order to deal with the resulting large scale model which cannot be solved directly by a general purpose solver, we propose two steps. The number of binary variables is reduced by choosing a representative subset of the variables of the original problem, and a rolling horizon approach enables the approximation of the long term (i.e. annual) problem by a sequence of shorter problems (for instance, monthly).
| Original language | English |
|---|---|
| Pages (from-to) | 649-659 |
| Journal | Journal of Scheduling |
| Volume | 16 |
| Issue number | 6 |
| Early online date | 14 Sept 2012 |
| DOIs | |
| Publication status | Published - Dec 2013 |
Fingerprint
Dive into the research topics of 'Mixed integer programming based maintenance scheduling for the Hunter Valley coal chain'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver